Submittal register · 48-hour delivery

Turn the spec book into a working submittal register

Send one CSI-formatted project manual. Get an editable Excel register of explicit submittal requirements with section, page, paragraph, type, and source notes—ready for your project team to verify and assign.

Your project team remains the reviewer of record. This service extracts and organizes explicit requirements; it does not approve submittals, interpret code, provide engineering advice, or certify completeness.

Source-cited XLSX

Each extracted row points back to the specification section, source page, and paragraph or heading where available.

Useful working fields

Submittal type, description, stated timing, named responsible party, reviewer status, owner, and notes for team follow-up.

Review checklist

Flags for unreadable pages, referenced attachments, ambiguous combined requirements, and items that need human confirmation.

From project manual to review queue

  1. You send one eligible manualA text-readable PDF, up to 400 pages, organized with CSI-style specification sections. No drawings, bids, pricing, personal data, or controlled documents.
  2. We extract and cross-checkExplicit product data, shop drawing, sample, certificate, test report, closeout, and other named submittal requirements are organized with source references.
  3. Your team receives the workbookUse the XLSX to verify scope, assign trades and reviewers, add dates, and import or adapt the rows to your project system.

Example output structure

Illustrative rows only. The delivered register reflects only the requirements found in your supplied manual.

Spec sectionSubmittal typeDescriptionSourceStated timingReview note
03 30 00Product dataConcrete materials and admixturesp. 142 · 1.4.ABefore mix design reviewConfirm package grouping
07 54 23Shop drawingsRoof assembly details and transitionsp. 286 · 1.5.BNot statedAssign roofing trade
09 91 00SamplesColor and finish samplesp. 354 · 1.3.CBefore field mockupReviewer to confirm count

Good fit

  • A small GC or subcontractor building the initial register after award
  • A text-readable project manual organized by specification section
  • A team that needs source references for fast internal verification
  • A register that will be reviewed before operational use

Outside this pilot

  • Drawings, BIM files, scanned or handwritten manuals, or more than 400 pages
  • Government-controlled, export-controlled, classified, or NDA-restricted material
  • Submittal approval, code interpretation, engineering, takeoffs, or scheduling
  • Direct entry into Procore or another production project system

Start the review with the requirements already organized.

If the manual is outside the published scope, payment is returned before extraction work begins.